China Plastic Injection Mold for Basket Tooling

Model NO.: Melee mould-757
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Color: Customized
Material: H13
Payment: Half and Half
Shipment: by Sea Ot by Air
Trademark: MELEEMOULD
Specification: SGS
Origin: Huangyan, Taizhou
HS Code: 8480710090
Detail description of Plastic box Moulds. Crate Mold, Crate Mould, Crate Mold Maker, Box mould, box Mould Making, Plastic box Mould, Plastic box Mold. Plastic Mold for turnover box storage basket. Storage basket mold.
Product Name: Plastic box Moulds
Product material: ABS, PP, PE or as per customer requirement.
Plastic Moulds/molds cavity: As per customer requirement
Plastic Moulds/molds size: Depends on your design.
Plastic Moulds/molds material: P20, 718...
Plastic Moulds/molds life: 800k shots
Plastic Moulds/molds Runner system: Cold runner or hor runner
Plastic Moulds/molds features: Good quality
Injection cycle time: 60seconds
Tooling time: 20days

MELEE MOULD Co., Ltd service process for Plastic Moulds/molds

1. Design/sample: Product, mould, etc.

2. Discussion: Mould material, cavity number, price, runner, payment, etc.

3. Order placed: According drawing or your samples.

4. Design mould: We will send mould design to customer for confirmation

5. Mould tooling: We start to make mould after mould design confirmed

6. Mould processing: Send pictures to customer every week for the customer to know the mould processing.

7. Mould shot trial: Send mould shot trial samples to customer to confirm mould quality

8. Delivery: Ship mould after mould quality confirmed.
Product Name Turnover box Mold
Size  800x450x500mm
Product description as per customer requirment
Crate Mould/Mold cavity 1cavity
Crate Mould/Mold size 1050x650x700mm
Suitable machine Around 650T
Crate Mould/Mold material P20, 718
Crate Mould/Mold life 800k shots
Crate Mould/Mold runner system Cold runner or Hot Runner
Ejection system  Ejector BAR
Crate Mould/Mold features Good quality
Injection cycle time 60 seconds
Tooling time 20days